Solar Power World

The Case for Solar: Developing a multi-project solar portfolio

Informações:

Sinopse

Fulfilling development tasks, arranging an interconnection agreement and designing and then building a solar array is no simple task. But Oakland, California-based solar developer Adapture Renewables did it 10 times over when it acquired a portfolio of projects planned for Western Oregon. In the third episode of The Case for Solar, associate editor Billy Ludt narrates his case study written for the September 2021 issue of Solar Power World. Read the case study here: solarpowerworldonline.com MUSIC "Himalayas" by Mona Wonderlick — bit.ly/youtube-monawonderlick Creative Commons — Attribution 3.0 Unported — CC BY 3.0 Free download: bit.ly/himalayas-download